| Type | 6.555 kWp grid connected photovoltaic (PV) system |
| Solar modules | 23 x REC TwinPeak 2 285TP2-BLK, 285W panels |
| Inverters | 1 x SMA Sunny Tripower 5000TL-20, 3 phase inverter |
| Location | Nedlands, WA |
| Date of commissioning | November 2017 |
| Type | 6.555 kWp grid connected photovoltaic (PV) system |
| Solar modules | 23 x REC TwinPeak 2 285TP2-BLK, 285W panels |
| Inverters | 1 x SMA Sunny Tripower 5000TL-20, 3 phase inverter |
| Location | Nedlands, WA |
| Date of commissioning | November 2017 |